PKG Painting Call or text (847) 555-0142

Our main work

Interior painting in the northwest suburbs

Our main work: walls, ceilings, trim and doors in houses, townhomes and condos. One room or the whole place. Most bedrooms take a day.

What's in a normal interior job

  • Moving furniture to the middle and covering it
  • Drop cloths on floors, tape and plastic where it's needed
  • Filling holes and dings, sanding, caulking trim gaps
  • Spot-priming patches and stains
  • Two coats on walls (more for big color changes)
  • Cutting clean lines at ceilings and trim by hand
  • Daily cleanup, then a walk-through and touch-ups with you

Prep is most of the job

We rate each room light, medium or heavy prep. Your quote shows which, so you know where the hours go.

Light prep

Nail holes, scuffs, a little caulk. Typical for walls painted in the last 5–8 years.

Medium prep

Hairline cracks, dents, open trim joints, a few patches to sand and prime.

Heavy prep

Water stains, peeling, glossy paint to sand, lots of patching or wallpaper residue.

What the work looks like

More photos

Paint roller putting light gray paint on a wall
Rolling a second coat
Person seen from behind pressing blue painter's tape along a ceiling line
Taping a ceiling line
Bright living room with light gray walls, white built-ins and a blue sofa
Light gray living room

Before and after

Before
After
Living room, warm white Illustration Drag or use the arrow keys to compare.
Before
After
Bedroom, sage green Illustration Drag or use the arrow keys to compare.

Before we come: your prep checklist

We move and cover the big furniture. These are the small things that make paint day go faster. Your checks are saved on this device only.

Common questions

Do I need to pick colors before you come out?

No. We can quote without colors. We'll bring a fan deck if you want help. Most people pick flat on ceilings, eggshell on walls and semi-gloss on trim. Try the finish quiz.

Do I have to leave the house?

No. We do one or two rooms at a time, so you've always got somewhere to be.

What paint do you use?

We use mid-to-upper-line paint from the big brands. If you have a brand or a leftover color you want matched, tell us.

How long does a room take?

A bedroom with light prep is usually one day. Whole floors take 3–5 days. Your quote will say.

Is there a minimum?

Yes. Small jobs have a minimum because of setup and travel. Ask and we'll tell you the number.

Want a price on your rooms?

Get a rough number online in a couple of minutes, or call and talk to a real person.